house logo and county slogan
0

Fire Station 4 & Fire Marshal–Clarendon Fire Station

AIRE retrofitted the lighting in Fire Station 4 in 2008, cutting electricity use.  Additional work on HVAC controls and a new water heater in 2009 helped cut energy use further. This fire station shows low energy use in 2012 due to other building improvements that left the building unoccupied for part of the year.

See the data and information below for more on the energy use and savings associated with this building.

2011 Energy Performance Label

Energy Use by Month (2007-2012)

Annual Energy Use Intensity*

Energy Snapshot

Address
1020 N. Hudson St.
Building Use
Fire Station/Office
Current Size
(sq. ft.)
21,238
Year Built / Major Renovation
1963
Annual Electric Usage
(kWh)
2007:  388,240
2008:  359,440
2009:  356,240
2010:  355,400
2011:  359,120
2012:  265,040
Annual Natural Gas Usage
(therms)
2007:  11,820
2008:  14,307
2009:  15,119
2010:  10,743
2011:  9,613.0
2012:  9,200
Site Energy Intensity
(BTUs/sq. ft.)
2007:  118,029
2008:  125,110
2009:  128,421
2010:  107,681
2011:  102,958
2012:  85,899
2007:  266,598
2008:  263,402
2009:  265,689
2010:  243,665
2011:  240,090
2012:  187,572
Carbon Footprint
(metric tons CO2 equivalent)
2007:  274
2008:  272
2009:  274
2010:  250
2011:  246
2012:  193
NA

*Site energy intensity is the amount of energy (electricity and natural gas) consumed per square foot of gross building area.

Back to Public Safety Buildings